Installation Instructions
Fifth Wheel Adapter Bracket Kit
Nissan Titan – Crew Cab/King Cab
Part Numbers:
58405
z 2010 Cequent Performance Products, Inc.
Sheet 1 of 3 58405N 5-23-12 Rev. D
Equipment Required:
Fastener Kit: 116408, (30512-Fastener Kit from 30035)
Wrenches: 3/4”, 7/8”
Drill Bits: 3/16”, 17/32”
Other Tools: Center Punch, Measuring Tape,
Phillips Screw Driver
Qty. (4) 1/2”-13 X 1.75” Carriage Bolt Qty. (10) 1/2” Flat Washer
Qty. (4) 1/4“ X 1.00” X 3.00” Block Qty. (2) 1/2” Pull wire
Qty. (4) 5/16” X 1.00” X 2.00” – U shaped Block
WARNING: Under no circumstances do we recommend
exceeding the towing vehicle manufacturers recommended
vehicle towing capacity.
3
2
1
Front of Vehicle
(Installation of this kit on vehicles with cargo box of less than 8’ may require
the installation of a Reese
®
Sidewinder™ Pin box or KIWK-SLIDE™.)
30035 Rail Kit
required for
installation
Fasteners listed below are supplied with this kit, all other mentioned fasteners are supplied with part number 30035.
4
Pullwire fasteners
through holes in
the frame
2
1
4
3
5
5
Comments to this Manuals